CourseCourseConceptConcept

IB Biology SL D4.1.4 Abiotic Factors As Selection Pressures Questions

Review how abiotic factors act as density-independent selection pressures and how temperature, drought, light, salinity and pH favour different variants.

Syllabus
First assessment 2025
Course
Biology SL
Level
SL

Exam points

  • Explain how abiotic environmental change alters selection pressure, favouring different variants in a population.

IB Biology SL D4.1.4 Abiotic Factors As Selection Pressures Questions question 1

[Maximum number: 2]

PanI is a gene in cod fish that codes for an integral membrane protein called pantophysin. Two alleles of the gene, PanI⁡A\operatorname{PanI}{ }^{\mathrm{A}} and PanI⁡B\operatorname{PanI}{ }^{\mathrm{B}}, code for versions of pantophysin, that differ by four amino acids in one region of the protein. Samples of cod fish were collected from 23 locations in the north Atlantic and were tested to find the proportions of PanI A{ }^{\mathrm{A}} and PanI B{ }^{\mathrm{B}} alleles in each population. The results are shown in pie charts, numbered 1-23, on the map below. The proportions of alleles in a population are called the allele frequencies. The frequency of an allele can vary from 0.0 to 1.0 . The light grey sectors of the pie charts show the allele frequency of PanI A{ }^{\mathrm{A}} and the black sectors show the allele frequency of PanI B{ }^{\mathrm{B}}.

Figure for Question IB Biology SL D4.1.4 Abiotic Factors As Selection Pressures Questions question 1 — IB Biology SL

The sites close to Iceland, at a latitude of 60−65∘60-65^{\circ}, had very varied allele frequencies, with both PanI A{ }^{\mathrm{A}} and PanI B{ }^{\mathrm{B}} occurring. The water at these sample sites was highly stratified, with much warmer water at the surface and much colder water below. Suggest reasons for both PanI⁡A\operatorname{PanI}^{\mathrm{A}} and PanI⁡B\operatorname{PanI}^{\mathrm{B}} alleles occurring at these sites.

All question bank results loaded