Q BankQuestion BankDocsDocuments

5.1.6—P = W / t

Syllabus
9702–2028–2029
Objective
5.1.6
Level
AS

Use P=W/t when work is transferred over a known time

For a process with work W completed in time t, average power is P=W/t. Rearranging gives W=Pt or t=W/P.

Keep time in seconds for watts and identify whether W is useful work or total input work before substituting.

A 1.2 kW lift doing 36 kJ of work takes 30 s if its power is constant.

A larger power does not mean more total work unless the operating time is also considered.

ConceptA-Level CAIE Physics AS